Customer: n/a
Object Description: Mineral & Drinking Water Bottling Plant
Project location: Armenia
Engineering systems:
HVAC,
Boiler house,
Smoke exhaust system
System Type: Boiler&Chiller, centralized cooling/heating with air handling units, heat recovery ventilation with VDI-certified adiabatic humidification/irrigation chamber
Technical data:
- Total capacity(cool/Heat): 925 kW / 4700 kW
- Total area: 7000 sq.m.
- Ventilation capacity: 165’ 000 m3/h
-
Burners: Dual fuel (gas and light oil) progressive type
- Heat carrier: PG35%
-
Emergency fuel complex (light oil): 800l